1. Before working, check the reducer under the workbench to see if there is lubricating oil;
2. The preload speed is lower than the experimental speed to prevent the two fixtures from touching, so as not to damage the fixture;
3. Carefully connect the lines of the sensor;
4. The screw and nut of the testing machine should be lubricated once every six months;
5. Keep the testing machine clean.







